Housing Jean Durroux – Foix

Contracting Authority – OPH 09

Phase – Delivery 2009

Cost – 3.8 M€ HT

Surface Area – 2 500 m2

Prime Contractor – W-Architectures (attorney)

Project Collaborators – Groupe Laumond-Faure (consultancy engineers), Le Douarin (economist)

Awards – Selection – Prix d’architecture Midi-Pyrénées 2011

slide on / off