High School Pierre de Fermat – Toulouse

Contracting Authority – Région Midi-Pyrénées – SPL Midi-Pyrénées Construction (Assistant Maître d’Ouvrage)

Phase – Under construction

Cost – 22.6 M€ HT

Surface Area – 18 000 m2

Prime Contractor – W-Architectures (attorney)

Project Collaborators – Beterem (consulting engineers), Gamma conception (consulting kitchen engineers), Nobatek (environnement engineers), Alayrac (economist)

slide on / off