Contemporary Glass Museum – Sars-Poterie

Contracting Authority – Conseil général du Nord (59)

Phase – Delivered 2016

Cost – 10.3 M€ HT

Surface Area – 3 000 m2

Prime Contractor – W-Architectures (attorney)

Project Collaborators – Terrel groupe (consulting engineers), Kaplan (landscape), Metapraxis (scenograph), Lignes (environnement engineers), Alayrac (economist)

slide on / off